18 - 19 February, 2020
London
Fabrizio Pagnanelli, Head of Engineering at Eddelbüttel + Schneider GmbH - part of Continental AG

Fabrizio Pagnanelli


Head of Engineering
Eddelbüttel + Schneider GmbH - part of Continental AG

Agenda Day 1 - 19 February 2019

Tuesday, February 19th, 2019


3:20 PM Determining the Optimal Balance between CAPEX and OPEX for Equipment of FPSO Projects: The Case Study of Seawater Intake Systems

  • Analysing the major operational cost drivers of seawater intake systems and their relation to the equipment specifications
  • Reviewing a selection of R&D projects which are aimed at reducing operational costs of the equipment
  • Evaluating the impact of the selection of technical requirements on operational costs and the importance of strong collaboration among FPSO project stakeholders in the initial project phases

Check out the incredible speaker line-up to see who will be joining Fabrizio.

Download The Latest Agenda