Breaking the 36-Month Bottleneck

Breaking the 36-Month Bottleneck

Complex FPSO projects now routinely run 30 to 36 months, and the queue for yard space is only getting longer. Our new market insight report unpacks what is driving the 36-month bottleneck and how the industry can break it:

  • A crowded pipeline: over 160 projects are in active planning, with more than 45 production units already on order.
  • Competing for the same docks: FPSOs vie with LNG carriers and container ships for yard slots, quayside space and labour.
  • Long waits for critical kit: gas turbines, compressors and high-pressure valves can take up to three years to arrive.
  • Delays that ripple: a late FPSO pushes back installation windows, SURF campaigns and first oil, eroding project value.
  • A shared way forward: measures such as standardised hulls, parallel fabrication and digital fit-up only pay off when operators, contractors, shipyards and OEMs align.

Download the report for the full details.