01 - 04 September, 2020 | Singapore

Mr Vincent Reboul Salze

Project Director – Karish Epcic Energean

Mr REBOUL SALZE is an experienced engineering and development manager active in the upstream oil and gas sector since over 15 years.


He graduated from Ecole Centrale Paris and followed through with a master in Petroleum Engineering at the IFP School.


He spent 10 years with Shell Upstream International gaining upstream production experience in both onshore and offshore, UK and Dutch sector, mostly exposed to gas production assets, developed as a process and appraisal engineer.


He then specialised in development planning for large offshore greenfield developments projects in Shell head office, focusing on a variety of floating production concepts including FPSOs, dry tree deep offshore floaters and small scale FLNG.


He lead the Shell start-up technical team in Kashagan between 2010/2013 and joined Energean in 2014 as engineering manager.


After being instrumental in growing Energean’s production base in Greece (deployment of new tender assist drilling barge “Energean Force” in brownfield shallow water context, new unmanned shallow water platform tie back Epsilon project ), he managed the conceptual and FEED work on Energean’s significant move to Israel deep water sector in 2016/2017.

He now leads the Karish Gas development which took FID in march 2018, in charge of the entire facilities scope currently under execution by Technip FMC under an iEPCiC contract structure.

Congress Day 1 - Tuesday, 10th September 2019

Tuesday, September 10th, 2019

11:00 AM Industry Power Panel: Retaining Cost Discipline while Driving Innovation for FPSO Projects

  • Reviewing business decisions and innovations made over the past few years contributing to improved project economics
  • Where and how else can FPSO contractors continue to innovate to transform FPSO engineering, constructionand operations?
  • Exploring further investments in areas such as digitalisation to maximise value across FPSO lifecycle management

5:45 PM Closing Keynote: Case Study - Delving into the Successful Delivery of the Karish-Tanin FPSO

• Streamlining budget, planning and execution strategies to ensure projects are on-time and within budget
• Promoting greater collaboration to prevent unforeseen downtime and maximise uptime
• Discussing the economic benefits that came about from the various cost-cutting measures

Check out the incredible speaker line-up to see who will be joining Vincent.

Download The Latest Agenda